Nomico
Enterprise platform in active build — ~90% MVP-ready; testing targeted from May 2026.

Product preview — interface capture or walkthrough.
Nomico is still in active development: most of the stack and product surface is in place (~90% toward MVP). A structured testing phase is planned from May 2026 before wider rollout.
Challenge
What we were solving
We are building a complex digital platform from a blank page — business requirements, product logic, user flows, security architecture, and production-ready implementation without leaning on a generic UI kit or inherited design system.
Approach
How we tackled it
- 01
Structured business analysis and stakeholder mapping to define product scope
- 02
UX architecture from first principles — complex workflows reduced to clear, learnable flows
- 03
Full design token system in Figma, then implementation in code
- 04
Multi-role IAM with RBAC — permissions at resource and action level
- 05
Production components in React and Next.js, aligned with Figma and typed TypeScript
- 06
Supabase for authentication, database, and real-time features with row-level security
- 07
Hardening the full system: audit logging, access control, and scalable data architecture ahead of the May 2026 testing window
Outcomes
Progress & current focus
Late-stage build: core product and infrastructure largely complete
~90% progress toward MVP scope; focus on stability and edge cases
Custom component layer — no third-party UI library dependency
RBAC model for 4 user tiers with resource-level permissions; design system with 200+ tokens
Structured testing phase scheduled from May 2026
Technology stack
Need something similar?
If your next build needs the same mix—strategy, design, engineering, security in one line—get in touch.